nirengi independent insulation consultancy

Drainage and Protection

Protection Screed

Concrete placed over the membrane to protect it from damage during construction and in use. At least 5 cm thick and separated from the membrane, with no bond to it.

Facing this issue on site?

Request a technical inspection

Definitions are for general information; product selection and acceptance values are governed by the technical data sheet of the system applied and the project specification.